My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-08-18_REVISION - C1980007 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-08-18_REVISION - C1980007 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:34 PM
Creation date
11/13/2008 1:08:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
8/18/2008
Doc Name
Exhibit 79 Deer Creek Shaft & E Seam Methane Drainage Wells Project
From
MCC
To
DRMS
Type & Sequence
PR14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Colorado Registered Permit (FSM <br /> 2733.04b <br /> and FSM <br /> 7730), 36 <br /> CFR 228 E <br /> 8. Professional Engineer, and submitted for USFS approval Forest Plan, <br /> for each road segment. The Engineer's recommendations AASHTO <br /> must be approved and implemented before any project Design <br /> related traffic may use that part of the NFSR system. Standard, <br /> During the course of the project the Forest Service will Road Use <br /> provide oversight of road improvement activities and Permit (FSM <br /> continued FS Engineering/FS designee monitoring of 2733.04b <br /> road conditions resulting from project related traffic. and FSM <br /> Temporary roads that are not open to the public are not 7730) <br />36 <br /> subject to AASHTO engineering standards for low , <br />CFR 228 E <br /> volume roads. <br />• 9. For roadway section with 6 inches OR LESS of new <br />structural surfacing section or existing surfacing sections Road Use <br />Permit (FSM <br /> with any aggregate segregation or contamination by 2733.04b <br /> intruding fine materials, no rutting, pumping or plastic and FSM <br /> deformation of the roadway surface will be allowed. 7730), <br /> Rutting, plastic deformation, or pumping of the surface BMP, <br /> will result in the proponent's operations, on that road, GMUG <br /> ceasing immediately and remaining shutdown until Forest <br /> repairs and improvements are made to prevent additional Standard <br /> damage to the structural section. For surfacing sections <br /> with GREATER THAN 6 inches of new structural <br /> surfacing section any rutting, pumping or plastic <br /> deformation in excess of structural section thickness (T) <br /> divided by 3 (T/3) will not be allowed and will result in <br /> proponent's operations, on that road, ceasing immediately <br /> and remaining shutdown until repairs and improvements <br /> are made to prevent additional rutting. <br /> 10. This T/3 limitation applies to any forest road utilized by Road Use <br /> the proponent, even if it is not part of the project area or Permit (FSM <br /> transportation plan. Once shutdown, operations will not 2733.04b <br /> resume until approved repairs or improvements are made and FSM <br /> to resolve the problem. These limitations apply to any 7730)' <br /> NFSR even if it is not included in the project area or BMP, <br /> transportation plan. GMUG <br /> <br />Amok Forest <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.