My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-17_PERMIT FILE - M2008017 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008017
>
2008-10-17_PERMIT FILE - M2008017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:14 PM
Creation date
11/11/2008 12:45:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
Permit File
Doc Date
10/17/2008
Doc Name
Exhibit F - Reclamation Plan Map
From
Broken Arrow Investments
To
DRMS
Email Name
MAC
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />M <br />m <br />8 <br />11 I t <br />/ i <br />I i <br />N <br />l � � 1 It <br />I lk J <br />I 3 <br />\l I I I W <br />Z It <br />l� I Q 1 Ir I 1 <br />It <br />It _ <br />� II <br />I _ <br />7 <br />/ <br />o ' I '� / ( <br />L <br />It <br />to <br />X <br />11 I I / <br />It 3:1 RECLAIMED <br />I I / <br />It <br />f xl 1 <br />�I <br />II <br />/ <br />X <br />I ` \ <br />i . <br />�l �I� <br />al <br />1/ J <br />(I i I �l I F INLET /OLUTLET \ <br />PIPELINE <br />l <br />/ <br />VARIES <br />0 <br />o ~_ Z <br />z z <br />J � <br />25' <br />OVERBURDEN AND TOPSOIL <br />w� BACKFILL ALL DISTURBED AREAS <br />OX :D J DOWN TO WATER SURFACE <br />a W J Q <br />a o_ cn 3 <br />N -T.S. <br />i ��i�� /i ' �i ' � .�• � 11 1 { \ \ \� ` / /`� � I �y <br />BACKFILL EXISTING <br />TRENCH WITH NATIVE <br />MATERIALS <br />VARIES <br />1. <br />1.5' TYP. <br />ASTM C33 -7 <br />CONCRETE <br />AGGREGATE <br />N.T.S. <br />1 <br />f <br />SANDY CLAY <br />OVERBURDEN <br />SAND AND GRAVEL <br />ALLUVIUM <br />�7[ \ \ \ �/ \ \ � � \ <br />111 i I I I 111 / � /� <br />LEGEND: <br />UTILITY POLE <br />- —� <br />GUY WIRE <br />1\ <br />1\ <br />I\ <br />GAS LINE MARKER <br />I <br />\ <br />WELL <br />11 <br />\ <br />ll <br />1 <br />I <br />/ <br />9 <br />/ <br />A <br />ELECTRIC TRANSFORMER <br />0 <br />TREE <br />El <br />TELEPHONE PEDESTAL <br />1 <br />f <br />SANDY CLAY <br />OVERBURDEN <br />SAND AND GRAVEL <br />ALLUVIUM <br />�7[ \ \ \ �/ \ \ � � \ <br />111 i I I I 111 / � /� <br />LEGEND: <br />WATER SURFACE <br />100 50 0 100 200 300 <br />SCALE IN FEET <br />NOTE: <br />ALL AND MULCHED � <br />D WI HTHEE EXCEPTON ACCESS A ROADS WHICH WILL BE GRAVEL SURFACED. <br />SLURRY WALL NOTES: <br />1. Qpntonite SDe ificnt'nns <br />YP /PV ratio API Std. 13A less than 3 <br />Viscometer greater than 30 <br />Filtrate Loss less than 15 cm3 <br />Moisture Content ASTM D 2216 less than 10 percent <br />Test results for each lot of bentonite must be provided. <br />2. Water Spe ifi ation <br />P 6 -8 <br />Hardness less than 200 ppm <br />Total Dissolved Solids less than 500ppm <br />Oil, organics, acids, alkali less than 50 ppm each <br />Chloride report <br />3. Bentonite Slurry Qjnr S <br />The initial bentonite slurry must be tested prior to placement in <br />the trench. The slurry may be mixecd in high shear mixers or <br />mixed and hydrated in slurry hydratiion ponds. In general, a <br />minimum hydration time of 8 hours will allow the bentonite slurry <br />to meet all criteria. A minimum bentonite content of 6 percent in <br />the slurry by weight is required. <br />4. Bentonite Slurry Testing Specifications before Placeme <br />Viscosity Measured w/ Marsh Funnel (API RP 13B -1) less <br />than 40 sec <br />Density less than 64 pcf <br />Filtrate Loss less than 20 cm3 <br />pH 6.5 to 10 <br />The tests listed above should be rum 1 or 2 times per shift and <br />at least once per batch of slurry. The slurry must be further <br />tested after placement in the trench.. The tests conducted are for <br />viscosity, density, sand content, and pH. Two sets of tests per <br />shift at two locations in the trench ((approximately 2 feet below <br />the slurry surface and 2 feet above the bottom of the trench) <br />are required. If the density of the slurry in the trench exceeds 85 <br />pcf the excess solids must be removred by desanding or the slurry <br />replaced with fresh slurry. The slurry level must be maintained at <br />least 3 feet above the ground water elevation and no more than <br />2 feet below the top of the working platform. <br />5. Bentonite Slurry T ctina Specifications after Pincemprit <br />Unit Weight 1.03 to 1.40 gm /cm3 <br />Sand Content ASTM D 43 81 - 84(1993)e10 to 20 percent by <br />volume <br />6. S_of� Bentanite Backfill Snor' +' <br />S -B Backfill slump ASTM C 143 1 set per 100 cu. yds. <br />Slump 2 -6 inches <br />S -B backfill gradation 1 set per 300 cu. yds. <br />Screen (US Standard) Percent by Dry Weight <br />3 inch 100 <br /># 4 40 -80 <br /># 25 -60 <br />#200 20 -40 <br />Minimum Plasticity Index of 10 <br />7, Slurry "'all an Snnr'f' + <br />During excavation, soundings should be obtained to determine the <br />elevations of the top of the key layer, the bottom of the <br />excavation, and the bottom of the trench prior to backfilling. If <br />sediments in excess of 2 inches have accumulated it is necessary <br />to clean the trench bottom by airlift pumps or excavation <br />equipment to remove the sand and sediment that has settled. The <br />trench bottom should be cleaned, as a minimum, at the beginning <br />of each shift. Soundings should be obtained approximately every <br />20 feet. <br />Adequate keying in the S -B backfill to on impermeable layer at <br />the base of the wall will be required and specified in the final <br />design report for the slurry wall. The design documents will include <br />a description of the key in layer and describe how trench cuttings <br />or other observations will be used to assure that the slurry wall <br />will be adequately keyed. Temporary slurry wall protection will be <br />required in the form of a noncompacted soil cover placed within <br />one day over each backfilled 100 foot reach. The temporary cover <br />is removed after settlement (approximately 2 weeks) and replaced <br />with a compacted clay cover over the completed slurry wall. <br />8. Post (onctruction TPS {ina <br />Post construction testing will be conducted in accordance with the <br />"Colorado State Engineer's Office." <br />9. Above specifications (notes 1 -8) are provided as a general <br />guideline for permitting purposes. Final specifications and design <br />criteria will be developed du ring the final design o th s l u rry wal <br />UTILITY POLE <br />- —� <br />GUY WIRE <br />0 <br />GAS LINE MARKER <br />GAS VALVE <br />WELL <br />OO <br />WATER METER <br />WATER FAUCET <br />W <br />9 <br />WATER LINE MARKER <br />A <br />ELECTRIC TRANSFORMER <br />0 <br />TREE <br />El <br />TELEPHONE PEDESTAL <br />T <br />9 <br />TELEPHONE LINE MARKER <br />PROPERTY LINE <br />FENCE LINE <br />- — <br />°E of <br />OVERHEAD XCEL POWER LINE <br />6- <br />EXISTING DCP MIDSTREAM GAS LINE <br />O <br />NORTH WELD WATER <br />DISTRICT WATER LINE <br />- - - - - - - <br />EXISTING CONTOURS (2' INTERVALS) <br />GRAVEL ROAD <br />PROPOSED PERMIT BOUNDARY <br />N <br />PROPOSED SLURRY WALL <br />e <br />PROPOSED CONTOURS <br />PERIMETER DRAIN <br />WATER SURFACE <br />100 50 0 100 200 300 <br />SCALE IN FEET <br />NOTE: <br />ALL AND MULCHED � <br />D WI HTHEE EXCEPTON ACCESS A ROADS WHICH WILL BE GRAVEL SURFACED. <br />SLURRY WALL NOTES: <br />1. Qpntonite SDe ificnt'nns <br />YP /PV ratio API Std. 13A less than 3 <br />Viscometer greater than 30 <br />Filtrate Loss less than 15 cm3 <br />Moisture Content ASTM D 2216 less than 10 percent <br />Test results for each lot of bentonite must be provided. <br />2. Water Spe ifi ation <br />P 6 -8 <br />Hardness less than 200 ppm <br />Total Dissolved Solids less than 500ppm <br />Oil, organics, acids, alkali less than 50 ppm each <br />Chloride report <br />3. Bentonite Slurry Qjnr S <br />The initial bentonite slurry must be tested prior to placement in <br />the trench. The slurry may be mixecd in high shear mixers or <br />mixed and hydrated in slurry hydratiion ponds. In general, a <br />minimum hydration time of 8 hours will allow the bentonite slurry <br />to meet all criteria. A minimum bentonite content of 6 percent in <br />the slurry by weight is required. <br />4. Bentonite Slurry Testing Specifications before Placeme <br />Viscosity Measured w/ Marsh Funnel (API RP 13B -1) less <br />than 40 sec <br />Density less than 64 pcf <br />Filtrate Loss less than 20 cm3 <br />pH 6.5 to 10 <br />The tests listed above should be rum 1 or 2 times per shift and <br />at least once per batch of slurry. The slurry must be further <br />tested after placement in the trench.. The tests conducted are for <br />viscosity, density, sand content, and pH. Two sets of tests per <br />shift at two locations in the trench ((approximately 2 feet below <br />the slurry surface and 2 feet above the bottom of the trench) <br />are required. If the density of the slurry in the trench exceeds 85 <br />pcf the excess solids must be removred by desanding or the slurry <br />replaced with fresh slurry. The slurry level must be maintained at <br />least 3 feet above the ground water elevation and no more than <br />2 feet below the top of the working platform. <br />5. Bentonite Slurry T ctina Specifications after Pincemprit <br />Unit Weight 1.03 to 1.40 gm /cm3 <br />Sand Content ASTM D 43 81 - 84(1993)e10 to 20 percent by <br />volume <br />6. S_of� Bentanite Backfill Snor' +' <br />S -B Backfill slump ASTM C 143 1 set per 100 cu. yds. <br />Slump 2 -6 inches <br />S -B backfill gradation 1 set per 300 cu. yds. <br />Screen (US Standard) Percent by Dry Weight <br />3 inch 100 <br /># 4 40 -80 <br /># 25 -60 <br />#200 20 -40 <br />Minimum Plasticity Index of 10 <br />7, Slurry "'all an Snnr'f' + <br />During excavation, soundings should be obtained to determine the <br />elevations of the top of the key layer, the bottom of the <br />excavation, and the bottom of the trench prior to backfilling. If <br />sediments in excess of 2 inches have accumulated it is necessary <br />to clean the trench bottom by airlift pumps or excavation <br />equipment to remove the sand and sediment that has settled. The <br />trench bottom should be cleaned, as a minimum, at the beginning <br />of each shift. Soundings should be obtained approximately every <br />20 feet. <br />Adequate keying in the S -B backfill to on impermeable layer at <br />the base of the wall will be required and specified in the final <br />design report for the slurry wall. The design documents will include <br />a description of the key in layer and describe how trench cuttings <br />or other observations will be used to assure that the slurry wall <br />will be adequately keyed. Temporary slurry wall protection will be <br />required in the form of a noncompacted soil cover placed within <br />one day over each backfilled 100 foot reach. The temporary cover <br />is removed after settlement (approximately 2 weeks) and replaced <br />with a compacted clay cover over the completed slurry wall. <br />8. Post (onctruction TPS {ina <br />Post construction testing will be conducted in accordance with the <br />"Colorado State Engineer's Office." <br />9. Above specifications (notes 1 -8) are provided as a general <br />guideline for permitting purposes. Final specifications and design <br />criteria will be developed du ring the final design o th s l u rry wal <br />LL <br />r <br />W <br />16 <br />Q <br />T <br />w <br />4) 4W <br />E d <br />N � <br />am <br />L <br />3 � <br />i <br />an Q <br />C <br />Ju <br />L <br />m <br />0 <br />z <br />O <br />U) <br />W <br />W <br />t <br />v <br />a) <br />m <br />0 <br />0 <br />z <br />D esigned By <br />cn�ed B <br />File JT-Redan <br />Scale <br />Sheet: <br />a <br />as <br />2 <br />cu <br />FL <br />C <br />0 <br />cu <br />E <br />0 <br />N <br />Cr <br />v <br />cu <br />c <br />N <br />2 <br />TIDY <br />1" =100' <br />MENEURNE01=111=1 <br />Of: <br />1 <br />2 <br />p . <br />�1 <br />`.� <br />N M <br />o <br />� d m <br />O <br />00 M <br />c <br />U <br />bi <br />O <br />Q <br />C <br />< <br />O <br />a �M° <br />N <br />N <br />o <br />ch <br />� d <br />LL <br />r <br />W <br />16 <br />Q <br />T <br />w <br />4) 4W <br />E d <br />N � <br />am <br />L <br />3 � <br />i <br />an Q <br />C <br />Ju <br />L <br />m <br />0 <br />z <br />O <br />U) <br />W <br />W <br />t <br />v <br />a) <br />m <br />0 <br />0 <br />z <br />D esigned By <br />cn�ed B <br />File JT-Redan <br />Scale <br />Sheet: <br />a <br />as <br />2 <br />cu <br />FL <br />C <br />0 <br />cu <br />E <br />0 <br />N <br />Cr <br />v <br />cu <br />c <br />N <br />2 <br />TIDY <br />1" =100' <br />MENEURNE01=111=1 <br />Of: <br />1 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.