My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-17_PERMIT FILE - M2008017
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008017
>
2008-10-17_PERMIT FILE - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:14 PM
Creation date
11/11/2008 11:33:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
PERMIT FILE
Doc Date
10/17/2008
Doc Name
Adequacy Review Response
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Broken Arrow Investments, 1-11 <br />Derr <br />Reclamation Bond Quantities and Costs <br />07123 Derr Pit Rec Bond <br />Phase 1A (12.48 acres) <br />ouanryniy uiswrueu area 12.5 ac $ 200 $ 2,496 <br />Topsoil Placement Disturbed Area 12.5 ac $ 1,800 $ 22,464 <br />Revegetate Disturbed Area 12.5 ac $ 1,000 $ 12,480 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 39,940 <br />Overhead and Profit Cost (12.60%) $ 5,032 <br />Contract Cost 44,972 <br />Project Management (9.25%) $ 4,160 <br />Total Required Financial Warranty For Phase 1A $ 49,132 <br />Phase IS (9.22 acres) <br />Scarifying Disturbed Area 9.2 ac $ 200 $ 1,844 <br />Topsoil Placement Disturbed Area 9.2 ac $ 1,800 $ 16,596 <br />Revegetate Disturbed Area 9.2 ac $ 1,000 $ 9,220 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 30,160 <br />Overhead and Profit Cost (12.60%) $ 3,800 <br />Contract Cost 33,960 <br />Project Management (9.25%) $ 3,141 <br />IAaamonat Financial Warranty Required For Phase 1B $ 37,101 <br />1A-1B <br />Phase 1 C (6.29 acres) <br />Scantymg Disturbed Area 6.3 -ac $ 200 $ 1,258 <br />Topsoil Placement Disturbed Area 6.3 ac $ 1,800 $ 11,322 <br />Revegetate Disturbed Area 6.3 ac $ 1,000 $ 6,290 <br />Mobilization 1.00 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 21,370 <br />Overhead and Profit Cost (12.60%) $ 2,693 <br />Contract Cost 24,063 <br />Project Management (9.25%) $ 2,226 <br />ICummulative Financial Warranty Required For Phase 1A-1C S 112.522 <br />2 of 4
The URL can be used to link to this page
Your browser does not support the video tag.