Laserfiche WebLink
CIRCES Cost Estimating Softwar <br />DEMOLITION WORK <br />STRUCTURE or ITEM DESCRIPTION <br />-NSI Plant <br />-Product Storage Dome <br />-Scale Building <br />-Removal of Conveyor System <br />-Removal of Overhead Powerline <br />-Tank Farm <br />-Removal of Pipeline _ DIMENSIONS <br />2001 x 1751 x 50'H <br />1001 x 100'W x 50'H <br />20'W x 1001 x 15'H <br />200'L <br />2100'L <br />30'W x 50'H (5 tanks) <br />3600 feet DEMOLITION MENU SELECTION <br />Demo./disp./excav. pit - 200' push <br />Demo./disp./excav. pit - 200' push <br />Demo./disp./excav. pit - 200' push <br />Conveyor, elevated- 5' W x 6'H <br />Power/phone line - single pole <br />Tank Removal and Disposal in pit <br />Pipe, welded steel -10 in. diam. QUANTITY <br />1,750,000.00 <br />500, 000.00 <br />30,000.00 <br />200.00 <br />2,100.00 <br />5.00 <br />3,600.00 UNIT <br />CF <br />CF <br />CF <br />LF <br />LF <br />Tank <br />LF UNIT COST <br />$0.2085 <br />$0.2085 <br />$0.2085 <br />$37.8300 <br />$2.5400 <br />$2, 000.0000 <br />$12.4900 TOTAL COST <br />$364,878.63 <br />$104,251.04_ <br />$6,25606 <br />$7,566.00 <br />$5,334.00 <br />$10,000.00 <br />$44,964.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $543,249 Vld? waa J-Jaaaa ?• -- - •---