My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-05_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2008-11-05_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:44 PM
Creation date
11/11/2008 7:46:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
11/5/2008
Doc Name
Final reclamation cost estimate
From
DRMS
To
Natural Soda, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 13a State :Colorado <br />sheet 1 of 2 <br />Date : 1110512008 County: Rio Blanco <br />User : THM Site :Natural Soda, Inc. <br />Permit or other job action :Final Reclamtion Cost Estimate <br />Task description : Mob/Demobilization <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />.......... .......... <br />IUf1N-RCIAnARI F FC]IIIPMFNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P 9.81 $11.29 $88.67 2 $199.92 $177.34 $500.00 <br />-Revegetation Tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $308.59 $266.01 $750.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour: , $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />Permit/job #:M-1983-194 <br />Abbreviation :none <br />Filename :M194-13a
The URL can be used to link to this page
Your browser does not support the video tag.