Laserfiche WebLink
ARW <br />NATURAL SODA <br />Au"ust 17, 2008 <br />From: NIN1 Bithell <br />To: Bob Warneke <br />Cindi Byrns <br />RE: 4A-4V P & A (July 3 to July 22 ) <br />Run a T' scraper to top of liner hanger. which was 1738 feet. Nett ran the 4 ' scraper inside <br />the 4'%" liner to 1880 feet. On July 11. the 4'/_" liner was cut at 1850 feet. Following the <br />extraction of the liner hanger and liner a CIBP was set at 1932 feet. Cementing the well took <br />place on July 22. The well was Plug=ged in six sta`-es starting.; at 1832 feet. To insure a <br />continuous column of cement in the casino, the cement top "was tagged with the trimmie pipe <br />before pumping the next stage. Below is the plugging data: <br />The well was successfully cemented (P & A*d) on July 22. 2008. The attached drawings shoxv <br />the well before plugging and after the successful P & A. In addition, a brief write-up of the <br />events is attached. <br />Sincerely, <br />NtM Bithell <br />BCS, Inc.