Laserfiche WebLink
NATURAL SODA <br />August 17, 2008 <br />From: MINI Bithell <br />To: Bob Warneke <br />Cindi Byrns <br />RF: 4A-6V P & A (JL1IN ; to July _13) <br />Run 7 5!8" scraper to top of liner hanger, which was 1771.58 feet. Next ran the 4 ! scraper <br />inside the 4 1/" liner to 1912.61 feet. On July 8, the 4 !!" liner was cut at 1,908 feet. Following.: <br />the extraction of the liner hanger and liner a C'IBP was set at 1802 feet. Cementing the well took <br />place on July 23. The well was pleigaed in five stages starting at 1802 feet. To insure a <br />continuous column of cement in the casing. the cement top was tagged with the trimmie pipe <br />before pumping the next stage. Below is the plugging data: <br /> <br /> <br /> <br /> <br />ELL <br /> <br />DEPTH <br /> <br /> <br />ELL <br /> <br />VOL <br />CUBIC FT <br />LL <br /> <br /> <br />EMENT <br />FCEENT <br />VOL <br />SACKS <br />M <br />WATER <br /> <br /> <br /> <br />SED <br />-GAL <br />WATER <br /> <br /> <br /> <br />SED <br />BBL <br />CEMENT <br /> <br /> <br />WEIGHT <br />PPG <br /> <br />1450-1802 <br />93 <br />81 <br />421 <br />10 14.90 <br /> <br />1100-1450 <br />93 <br />81 <br />419 <br />10 15.10 <br /> <br />750-1100 <br />93 <br />81 <br />419 <br />10 14.80 <br /> <br /> <br />400 - 750 <br />93 <br />L <br /> <br />81 <br /> <br />419 <br /> <br />10 14.90 <br /> <br />0-400 E <br />106 <br />92 <br />479 <br />- 14.150 <br /> <br />1802 <br />477 <br />415 <br />1 2,`157 <br />51 14.90 <br />The well was successfully cemented (P & A'd) on July 23, 2008. fhe attached drawings show <br />the well before plugging and after the successful P & A. In addition, a brief write-up of the <br />events is attached. <br />Sincerely. <br />MNI Bithell <br />BCS. Inc.