Laserfiche WebLink
.T . <br /> Photo 5 - Rock armoring on north end of North Pit backfilled slope that was placed in November 2007 <br /> for protecting vegetated backtill (on left side of photo) from runoff on sandstone dipslope(on right <br /> side of photo). <br /> Photo 6- Looking south over permit area from top of North Pit slope. <br /> 9 <br />