Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: Pond #4 <br />Inspection Period: Second Quarter 2008 <br />Inspection Date: June 28, 2008 <br />General Description or Reference to Site Plan: <br />This pond is located on the north east comer of the refuse disposal area. It is a sediment control <br />facility receiving run-off from the refuse disposal area. The primary discharge gate has been disabled <br />in the open position, ensuring that the pond functions as a "pass-through" facility. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Yes No v <br />Yes No y <br />4). Erosion of the downstream toe of the embankment? Yes No <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes No /I <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Excellent Moderate Few Poor <br />Extensive Some None <br />Yes !i No <br />Yes V No <br />Yes No <br />Yes No r/ <br />Just starting None <br />Page 1 of 2