My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-11-06_INSPECTION - M2008044
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2008044
>
2008-11-06_INSPECTION - M2008044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:45 PM
Creation date
11/10/2008 11:40:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008044
IBM Index Class Name
INSPECTION
Doc Date
11/6/2008
Doc Name
Inspection report
From
DRMS
To
Palmer Pipe and Construction
Inspection Date
10/7/2008
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 06-Nov-2008 <br />User : WHE <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. M-2008-044 Site : Fork Horn Mesa Subdivision <br />Abbreviation : none State : Colorado <br />Filename : M044-000 County :La Plata <br />Agency or organization name :DRMS <br />Permit or job action : New 110 permit application <br />BASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Rough grade and rip 2 acres affected area dozer 1 7.81 $1,114 <br /> <br /> <br />002 -Revegetate 2 acres affected land revege 1 4.0 $689 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 3 3.3 $1,137 <br /> <br />004 -Remove misc debris, assume mass 5'H x 5'W x 5'L @ $0.221cf NA 1 2.0 $28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 17.11 $2,968 <br />' includes inflation factor adjustment of : NA % TOTAL DIRECT COST ' =I $2,968 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $60 <br />Performance bond : 1.05 % of direct total = $31 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $297 <br />' not required (or eqp. operator serves as super.) TOTAL O & P = $388 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $3,355 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $168 <br />CONTINGENCY - NA* NA total = NA <br />' contingencies accounted for at task level TOTAL INDIRECT COST = $556 <br /> TOTAL BO ND AMOUNT (direct + indirect) = $3,523 <br />
The URL can be used to link to this page
Your browser does not support the video tag.