|
CLIMAX MM RECLAMATION PLAN-Rectsek►"on Plaa and Get Workshoot.
<br /> 193
<br /> 9 Plan Amendment Data: April,1989
<br /> Amendment Promises Swing Producer Open Pit up to 24.000 t/d.Mine Life>ZO operating years.-
<br /> Plan Schedule Basis:on-going.Interim Priority,Interim Non-priority,End of Mine Life.
<br /> AFFELTED AREASI FINAL LAND USES I GENERAL TIMETAB GRADING/SITE PREPARATION INFORMATION REVEGETATION INFORMATION ESTIMATED AND PROJECTED RECLAMATION COSTING INFORMATION
<br /> :Mat.Removal Flood Rock Reveg. Grand
<br /> Map ID Name Acres Begin Complete I 1 6 Grading Control Cap $2000/acre Line Totals Cost/Acrs Totals
<br /> ------- ---- - ----------------------------------------------- -- - -- -- --- -
<br /> A Active Operating Areas 2766 End of Mine Life - 'Standard'refers to methods and materials for reveget ttion as per the original seine permit. $341.000 $5.474.440 $5.341.026 13.S6a,000 115.5Z4.466 $4.269 $13.524,466
<br /> l Storke Portal Complex 62 RL,IC Termination 10 years Dismantle structures w/o future use;plug adits:grade to 3:1 Slopes. Standard,Probable use of 4%6'of topsoil from Arkansas and Fremont stockpiles. $50.000 S124.000 $174.000 $2.8% S174.000
<br /> 2 Open Pit Area 591 Mountain Talus Termination 10 years Grade to 3:1 slope where practical:blast and smooth outcrops where practical. Standard.Effort confined to-50 ac.at pit periphery. $75.000 $100.000 f 175.000 S2% $175.000
<br /> 3 Mine/Mill Complex(OP Dump) 219 RL,IC Termination 10 years Dismantal structures w/o/future use;grade to 3:1 slope where needed. Standard,probable use of 4-6'of topsoil from Fremont stockpile in selected areas. I 5100,000 $439.000 $538.000 $2,457 $539.000
<br /> 4 "E'Dump Complex 171 RC-winter.IC Termination 10 years Dismantle structures w/o future use;contour upper bank stapes to 2.5-3:1 where practical. Standard on slopes.Possible use of 4'-6'of topsoil on-15 ac.of selected areas on top of dump. S50.000 S30,000 $80.000 S468 S80.000
<br /> 5 McNulty Dump Complex 155 RC-vinter.IC Termination 10 years Dismantle structures w/o future use;contour upper bank slopes to 23-3:1 where practical. Standard on slopes.Possible use of 4--6'of topsoil on-20 se.of selected areas on top of dump, j $50.000 $40.000 $90.000 $331 $90.000
<br /> 6 Ten Mile Tailing Pond 544 RL,RC-winter Termination 10 years Dry;establish flood drainage and control:apply rock rep(6'-3'depth). Topsoil will be unavailable.Revegetation based on test results. S839,160 f 1.534,709 $1,088.000 S3.461,869 S6,364 $3.461,869
<br /> 7 Ten Mile Barge Complex 2 RL Termination 10 years Dismantle structures w/o future use;grade for drainage. Standard.Probable use of 4--6'of topsoil if available from Mayflower stockpiles. I $5,000 $4,000 $9.000 $4.500 $9.000
<br /> 8 Ten Mile Tunnel Complex 2 RL.IC Termination 10 years Dismantle structures w/o future use;grade for drainage. Standard.probable use of 4--6'of topsoil if available from Mayflower stockpiles. $4.000 S4.000 $2,000 $4.000
<br /> 9 Pond Shop Area 2 RL Termination 10 years Dismantle structures w/o future use;grade for drainage. Standard.Probable use of 4'-6'of topsoil if available from Mayflower stockpiles. $1,000 S4.000 S5.000 $2.500 S5.000
<br /> 10 Mayflover Tailing Pond 346 RL,RC-winter,WR Termination 10 years Dry;establish flood drainage and control;apply rock cap(6'-3'depth).Initiate on beach area:1990. Topsoil(4'-6')may be available for portions.Revegetation based on test results. I $3.829.290 $1.816.771 $692.000 $6.338,051 $19,319 $6.338,051
<br /> 11 Water Treatment Plant Complex 5 RL,RC-winter Termination 10 years Dismantle structures w/o future use;grade for drainage. Standard.Probable use of 4'-6'of topsoil if available from Mayflower stockpiles. f10.000 $10,000 f20,000 $4.000 $20,000
<br /> 12 Robinson Tailing Pond/No.2 Dam 667 RL,RC-winter Termination 10 years Dry;establish flood drainage and control;apply rock cap(6'-3'depth). Topsoil will be unavailable.Revegetation based on test results. $906,000 $2.489346 $1.334.000 f4.629.W S6.%l $4.629346
<br /> - --- - -------
<br /> B Interim Reclamation Areas 243 Priority This work includes construction of highway - -- - ----------------------------- --------------------------------------- --
<br /> 1 NO.1Dam ecla atiIncl.road 123 Priority 1989 7 ears(eat.) Grade r in underpass in Buffeters area. - The physical/chemical nature of these areas may limit the success of revegetation_ I SO SO $1,043,a99 $496,000 11,529,a99 $7274 S1.529,a99
<br /> y Slope;construct toe drains;cap with waste or quarry rock. The standard will be tested on a small area to determine viability.Topsoil is unavailable. $348229 f246.000 $7%229 $6.457 $794229
<br /> 2 No.3 Dam(Ten Mile) 100 RC-winter 19% 7 years(est.) Presently sloped to 3:1;cap with waste or quarry rock. Attempts to revegetato with the standard will be based on degree of success of tests.Topsoil is unavailable. I S335.443 $200.000 $533,443 $5,354 $533.443
<br /> 3 No.5 Dam(Mayflower) 20 RC-winter 1989 3 years(est) Presently sloped to 4:1.cap with waste of quarry rock. Standard. Probable use of 4'-6'of topsoil if available from Mayflower stockpiles. $160227 $40.000 SZ00227 $10.011 S200.227
<br /> C Interim Reclamation Areas 63 Non-Priority This group of areas we small and will be graded for drainage as seeded. These areas vill be revegetated with the standard. I 14,000 $O 10 -$130,000 $134.000 $2,035 $134.000
<br /> 1 Entrance to Storke Complex 1 RL,FR >-1990 1 year Grade for drainage and erosion control. Standard. S2.000 S2.000 S2.000 12,000
<br /> 2 Near road to McNulty Dump I RL.FR -1990 1 year Grade for drainage and erosion control Standard. ! S2.000 SZ.000 $2,000 $2,000
<br /> 3 Near road to McNulty Dump 3 RL,FR >-1990 1 year Grade for drainage and erosion control. Standard. S6,000 S6.000 $2.000 $6,000
<br /> 4 Old tailing south of Buffehrs 3 RL.FR >-1990 2 years Grade for drainage and erosion control. Standard.Topsoil(4'-6")will be utilized. I $500 $6,000 S6,500 $2.167 S63M
<br /> 3 West of Buffehrs 5 RL,FR >-1990 2 years Grade for drainage and erosion control. Standard.Topsoil(4"-6')may be utilized. $1.000 SI0,000 $11,000 $2200 $11,000
<br /> 6 West of Buffohrs 2 RL,FR -1990 1 year Grade for drainage and erosion control. Standard. S4.000 $4.000 S2.000 S4.000
<br /> 7 West of No.I Dam 4 RL,FR >-1990 1 year Grade for drainage and erosion control. Standard. $9,000 $8.000 $2,000 $8,000
<br /> 8 West of No.1 Dam 4 RL,FR >-1990 1 year Grade for drainage and erosion control. Standard. ' $8,000 $8,000 $2,000 $8.000
<br /> 9 Northwest of No.1 Dam 2 RL,FR -1990 1 year Grade for drainage and erosion control. Standard. S4,000 $4.000 $Z.000 $4.000
<br /> J 10 Northwest of No.l Item 1 RL.FR >-1990 1 year Grade for drainage and erosion control. _. _ Standard. $2,000 $2,000 $2.000 $2.000
<br /> 11 Northwest and of Robinson Lake 3 RL.FR >-1990 1 year Grade for drainage and erosion control. Standard. $6,000 $6,000 $2.000 S6.000
<br /> 12 Southeast of No.4 Dam Reservoir 4 RL.FR -1990 1 year Grade for drainage and erosion control. Standard, S8,000 $8.000 $2,000 $9,000
<br /> 13 East of No.4 Dam Reservoir 9 RL,FR 1-1990 2 years Grade for drainage and erosion control. Standard.Topsoil(4'-6')may be utilized. f 1.0DO f 18.000 $19.000 $2.111 $19,000
<br /> 14 East of No.4 Dam Reservoir 2 RL,FR -1990 1 year Grade for drainage and erosion control Standard. $4.000 $4,000 S2,000 $4.000
<br /> 15 East of Robinson Tailing Pond 1 RL,FR >-1990 1 year Grade for drainage and erosion control. Standard. I $2.000 $2.000 $2.000 $2,000
<br /> 16 East of Ten Mile Tailing Pond 2 RL,FR >-1990 1 your Grade for drainage and erosion control. Standard. $4.000 $4,000 $2.000 1000
<br /> 17 East of Ten Mile Tailing Pond 1 RL.FR >-1990 1 year Grade for drainage and erosion control. Standard. 12.000 $2.000 S2,000 $2.000
<br /> 18 East of Ten Mile Tailing Pond 2 RL,FR -1990 1 year Grade for drainage and erosion control. Standard. $4.000 $4,000 $2.000 $4.000
<br /> 19 Old rock stockpile area 3 RL.FR >-1990 1 year Grade for drainage and erosion control. Standard.Large rocks and outcrop in this area. $500 S6.000 $6,500 S2.167 $6300
<br /> 20 East of No.3 Dam 2 RL,FR -1990 1 year Grade for drainage and erosion control. Standard. S4,000 $4,000 $2,000 S4,000
<br /> 21 Mayflower kith dust area 6 RL.FR >.1990 I years Grade for drainage and erosion control. ::? Standard.Topsoil(4'-6')will be utilized as necessary. f 1,000 512.000 $13.000 f2,167 $13,000
<br /> 22 Ryan camp area below No.3 dam 2 RL,FR >-1990 I year Grade for drainage and erosion control. Standard. $4.000 $4.000 S2,000 S4.000
<br /> 23 South of No.5 Dam 2 RL,FR >4990 1 year Grade for drainage and erosion control Standard $4.000 $4.000 $2,000 S4,000
<br /> D A" Dador Reelaassakes w An•r 1967 Those areas will he variable. $600.000 $30.000 $O $120.000 $770.000 $12.333 $770,000
<br /> I Arkansas River Area 60 RL.FR.RC 1987 1992 Remove Storke settling ponds•,reestablish river channel and rip-rap:gee for draingge'control. Standard.Rip-rsp along river banks.Willow cuttings may be planted. S600,000 $50,000 $120,000 S770,000 $12,833 $770.000
<br /> E Topsail Stockpiles 10 After Utilization. Start After Sell Used Topsoil stockpile areas are small and will be graded for drainage control as needed. These small atessvill revegetate readily. SO SO $O $20*000 115,000 12,000 113,000
<br /> 1 Arkansas River area 1 RL Unknown I year Grade for drainage and erosion control. Standard. S2.000 S2,000 $2,000 $2,000
<br /> 2 Fremont Pass 1 RL. Unknown I year Grade for drainage and erosion control. Standard. $2.000 $2,000 $2.000 S2,000
<br /> 3 McNulty Dump area 3 RL I Unknown 1 year Grade for drainage and erosion control. Standard. $6,000 $6,000 $2.000 $6.000
<br /> 4 Mayflower Tailing Pond area 2 RL' Unknown I year Grade for drainage and erosion control. Standard. S4,000 $4.000 $2.000 S4,000
<br /> 5 Mayflower Tailing Pond area I. RL i Unknown 1 year Grade for drainage and erosion control. _. Standard. $2.000 S2,000 $2.000 $2.000
<br /> 6 No.5 Dam area 2 RL Unknown 1 year Grade for drainage and erosion control. Standard. $4.000 ' $2.000 $2.000 $2.000
<br /> F Water Storage Sites 223 Permanent These Sites Completed These permanent water facilities will require little or no grading. If these sites are disturbed,the standard vill be used for revegotation. $0 $0 $O $O SO 10 SO
<br /> I Buffehr Reservoir 5 WR No grading required.
<br /> 2 Chalk Mountain Reservoir 13 WR No grading required.
<br /> 3 Robinson Lake 72 WR i No grading required
<br /> 4 No.4 Dam Reservoir 46 WR Minor grading for drainage control at east side of area
<br /> 5 Clinton Reservoir 92 WR No grading required.
<br /> --- -- - -----
<br /> --- --------------- ----- --�- - ---- ---- -- ---- --- --------- --- - -- ----- -- -- ----- ---------- -- -- �----------------------------- -------------------_-_-- - ----
<br /> TOTAL AFFECTED ACREAGE: 337Z
<br /> TOTAL BONDABLE ACREAGE: 3144 !
<br /> i
<br /> COSTTOTALS: j $945.000 f5.5Z4,440,$6,884.925 S4,624,000 f17,976,365
<br /> \ GRAND TOTAL: 17 976 6 $17,976.365
<br /> 1 AVERAGE COST PER ACRE: 71E J IL
<br /> ' 71a
<br /> ............................................................................. ............................................................................. ..................................................................................... ..................................................................................
<br />
|