<br /> CLIMAX RECLAMATION COSTS - Rock Haul and Capping Costs
<br /> Calculated Costs per Unit and Costs per Area Identified for Reclamation
<br /> Date: April, 1989
<br /> ------------------ ------------------------ ----------------------- ------- ----------------------------------------------------------
<br /> Tons Load/ Load/ Ave. Haul/Road Haul/Road
<br /> - 2' Depth Spread Spread Haul Ton Maint. Construct_
<br /> j AREA Acres (1.5 T/yd3) $/Ton Subtotal Hiles Miles $/Ton Maint. TOTAL
<br /> Robinson Pond 677 3,293,050 $0.20 $658,610 2.78 9,154,679 $0.20 $1,830,936 $2,489,546
<br /> No.1 Dam 123 700,445 $0.20 $140,089 2.44 1,709,086 $0.20 $408,140 $548,229
<br /> Tenmile Pond 544 2,549,350 $0.20 $509,870 2.01 5,124,194 $0.20 $1,024,839 $1,534,709
<br /> No.3 Dam 100 481,958 $0.20 $%,392 2.48 1,195,256 $0.20 $239,051 $335,443
<br /> Mayflower Pone 346 1,824,067 $0.20 $364,813 3.98 7,259,787 $0.20 $1,451,957 $1,816,771
<br /> No.5 Dam 20 145,926 $0.20 $29,185 4.49 655,208 $0.20 $131,042 $160,227
<br /> i
<br /> I
<br /> TOTALS: 1810 8,994,7% $1,798,959 25,098,209 $5,085,965 $6,894,924