Laserfiche WebLink
?CO?MA Comanco Environmental Corporation <br />.a,.te :eMK?aa:ea.nea Daily Panel Placement Page Project Name: Cripple Creek Flap Extension Job #_05083083 Deployment Date <br /> <br />Superintendent: Pablo Medina material Type: ,U42 kV A J T - S <br />ElPrlmary Secondary Cell Pond PadF_j Other: <br />Description (i e. Phase g cell #, Pond # etc.) <br />Roll Stock Width <br />Panel # Roll # Panel # 2 Roll # Panel # 3- 1 Roil # <br /> Final Length Avg. LF Final Lend Avg LF Final Length Avg. LF <br /> Final WMth Avg. LF Final Width Avg. EILF Final Vedth Avg. LF <br /> Initial Length Avg. LF at9 Lenglll A LF Initial Length Avg LF <br /> Initial Width Avg. LF Initial Width Avg. IF Initial VNd1h Avg. LF <br /> 12 <br /> Q <br /> <br /> ? M <br />Notes :....................... ?!? ?'1 ( Notes: M Notes: N <br />.......................................... <br /> M <br /> 18 2 <br /> 1 Z <br />Initial SF 14 0 Lineal Feet Trench Initial SF Lineal Feet Trench Initial SF Lineal Feet Trench <br />Final SF Final SF 7 Final SIF 2.9,114 <br />Panel # Roil # Panel # Roll # Panel # Roll # <br /> Final Length Avg LF Final Length An LF Final Length Avg. LF <br /> Final Width Avg. LF Final WIM Avg. LF Final Width Avg. LF <br /> Initial! Length Avg LF Initial Length Avg. LF Initial Length Avg LF <br /> Initial Width Avg. LF Itdtial IAlfdth Avg. LF Initial Wkth Avg. LF <br /> 12 12, <br /> 12 ! )z <br /> c <br />4- <br />Notes: Notes: tin M r% a <br />Notes: Q <br /> ... ........... <br />_.__._.._..._......... <br /> 12 <br />12 <br />Initial SF 2-11 2 Lineal Feet Trench Initial SF Lineal Feet Trench Initial SF 12-7 Lineal Feet Trench <br />Final SF /L D ay Final SF N Final SF 2u <br />Panel # Roll # Panel # Roil # Materlal In Anchor Trench <br /> Final Length Avg. LF Final Length Avg. LF Total LF In Trench This Page LF <br /> Foal WWth Avg LF Final Wft Av¢ LF Depth and Width Albwed in Trench <br /> IrM Lalglh Avg IniaN Length Avg. LF Total SF Trench This Page r <br /> t t" Wlft Avg. LF in" MAM Avg. LF Total Panel SF This Page Wnt"A <br /> 12 Total Pay Area This Page <br /> !2 LF In Trench Previous <br /> LF In Trench To Date LF <br /> SF In Trench Previous SF <br /> M Total SF In Trench to Date SF <br />Notes: '` Notes: Total Panel SF Previous SF <br /> Total Panel SF To Date SF <br /> Total Pay Area To Date <br /> 1 2 Including Anchor Trench <br /> Initial Quantity Previous <br />Initial SF Lineal Feet Trench Initial SF Lineal Feet Trench Initial Quantity This Page Si <br />M <br /> <br />Final SF <br />Aj <br />Final SF <br />Initial Quantity To Date SF