Laserfiche WebLink
TWENTYMILE COAL COMPANY - FOIDEL CREEK MINE <br />MINOR REVISION MR08-232 - 6MN POWERLINE CONSTRUCTION <br />SUMMARY OF REVISIONS/ADDITIONS (11/04/08) <br />REVISION/ADDITION DESCRIPTION PLACEMENT INSTRUCTIONS <br />OPERATIONS PLAN - MINE FACILITIES RULE 2.05 <br />Page 2.05-47.1 Revised text incorporating Replaces Page 2.05- 47.1 in <br /> discussions of powerline Volume I <br /> construction for 6MN Reservoir <br />APPENDICES <br />Appendix A - Bond Additional page with incremental Insert in Appendix A, Volume 1- <br />Calculations bonding calculations for A <br /> reclamation of new owerlines <br />EXHIBITS <br />Exhibit 49P - Additional drawings for powerline Insert at the back of Exhibit 49P <br />- Powerpole/line locations construction in Volume II-E <br />MAPS <br />Map 24, Surface Facilities Revised map showing new Replaces Map 24 (2/3) in <br />and Freshwater Systems owerline and poles Volume V-A