My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1996084 (10)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996084
>
_INSPECTION - C1996084 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 7:57:50 AM
Creation date
11/3/2008 3:11:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
10/28/2008
Email Name
KAG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection conducted by Kent Gorham of the Colorado Division of <br /> Reclamation, Mining, and Safety (Division). This mine site is currently completing the final <br /> stages of reclamation of disturbed areas. Ground conditions were dry. The weather was <br /> clear and very mild. <br /> Roads <br /> The permanent road traversing the disturbed area was found in excellent condition. Portions <br /> of this road not within the disturbed area were bond released under an industrial land use for <br /> their main use for coal bed methane extraction activities. <br /> Hvdrolooic Balance <br /> Ponds continue to hold modest amounts of water going into the winter season. Pond 6, 7, <br /> and 8 were visited. None were discharging. The weir boxes at each pond should be cleaned <br /> of sediment and weeds debris to ensure proper function and flow measurement. <br /> Repair work on the three excess spoil fill downdrains has begun. On this day, the excavator <br /> was under repair to replace parts on the tracks to allow safe working conditions on the steep <br /> slopes of the fills. Some initial work had been started on the west downdrain of Fill 8, shown <br /> below. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.