My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-09_PERMIT FILE - M2008060
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008060
>
2008-10-09_PERMIT FILE - M2008060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:00 PM
Creation date
10/31/2008 11:19:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008060
IBM Index Class Name
PERMIT FILE
Doc Date
10/9/2008
Doc Name
Cost Estimate
From
DRMS
To
File
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Haulina Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 1,600 pounds/LCY <br />Material description <br />Top Soil <br />Rated payload : 75,000 pounds <br />Payload capacity : 46.88 LCY <br />Cycle Time : <br />Scraper loading time * : 0.60 <br />Maneuver and spread time : 0.70 <br />* load time per scraper pair on push-pull models <br />Scraper Bowl (volume) Basis : <br />sheet 2 of 2 <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 4,536 <br /> Scraper Push dozer Source <br />minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />minutes Job efficiency : 0.830 0.830 (Cat HB) <br /> Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 263 0.00 5.00 5.00 1343 0.27 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.27 minutes <br />Return route <br />1 263 0.00 5.00 5.00 2445 0.33 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />" travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.33 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 1.89 minutes <br />Unadjusted unit production/hour : 918.56 LCY/hour *** Adjusted for job conditions : 762.41 LCY/hour <br />Optimal number of scrapers per push dozer : 2 Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,524.81 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,524.81 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 7.51 Hours <br />Unit cost : $0.396 /LCY Total job cost : $4,532 <br />
The URL can be used to link to this page
Your browser does not support the video tag.