My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mark Vanoni <br />Senior Environmental Coordinator <br />Phase IVB1C Berm Raise <br />Project 84201125DO <br />October 30, 2008 <br />aneO <br />The berm raise should be constructed following the Technical Specifications approved under Amendment <br />No. 8 (Permit M-80-244), attached to this letter. These Specifications provide details on the material <br />grading, Construction Quality Assurance, minimum geosynthetic test frequency, and documentation. For <br />this project, the following substitutions to the Amendment No. 8 Technical Specifications are acceptable: <br />1. If needed, 60-mil smooth or single-sided textured LLDPE may be substituted for 80-mil <br />LLDPE. This is an acceptable substitution since the berm raise is not used for ore or solution <br />storage. <br />2. The geomembrane flap over the berm raise does not need to be covered with DCF, as stated <br />in the Specifications. The desire is to create a hydraulic break between the VLF and the <br />perimeter berm. This can only be accomplished by leaving the geomembrane liner flap <br />uncovered. <br />If you have any questions or comments, please contact me at (303) 433-0262. <br />Sincerely, <br />AMEC Earth & Environmental, Inc. <br />n F. Lupo, Ph.D., P.E. <br />Principal Engineer <br />JFL:rjg <br />Attachments: Drawing 1 - Berm Raise Plan and Details <br />Drawing 2 - Infiltration Pipes Plan and Detail <br />Engineering Calculations <br />Amendment No. 8 Technical Specifications <br />\\\1\11t <br />`g Qp0 REC ?•... <br />? ? ?sdar?T <br />t S <br /> <br />s:VprojectsN 125d cr&v adr & slf Beotech dasgn%YA - oftr [mportsterm raise 18W.dw 2
The URL can be used to link to this page
Your browser does not support the video tag.