Laserfiche WebLink
The CQA monitor shall review the following submittals by INSTALLER during the <br />project: <br />verification that a qualified land surveyor has verified all lines and grades; <br />and <br />subgrade surface acceptance certificates for each area to be covered by the <br />lining system, signed by the INSTALLER. <br />The CQA Monitor shall: <br />10 Inspect all geosynthetic materials delivered to site. The CQA Monitor shall <br />document any damage and notify MANAGER; <br />obtain geosynthetic packaging identification slips for verification and <br />generation of an on-site materials inventory; <br />observe subgrade conditions prior to geosynthetics installation and verify <br />that any deficiencies, as defined in Section 02200 of the SPECIFICATIONS, <br />are corrected; <br />observe permanent anchoring of geosynthetics to verify that design and <br />project SPECIFICATIONS are met; <br />10 observe that required overlap distances are met; <br />monitor and record ambient air temperatures: <br />verify that no continuous horizontal seams are placed on slopes unless <br />approved by CERTIFYING ENGINEER; and, <br />observe and document that all soil materials placed on top of the <br />geosynthetics are done in such a manner as to ensure that the geosynthetics <br />are not damaged. <br />6.03.01 GEOMEMBRANE: <br />During geomembrane installation, the CQA Monitor shall observe and document <br />deployment, trial seams, field seaming, non-destructive and destructive seam testing, <br />and repairs to assure that the installation is in compliance with the SPECIFICATIONS. <br />Deployment - The CQA Monitor shall verify that only approved materials are <br />used, each panel is given a unique panel number, no geomembrane is placed <br />during unsuitable weather conditions as outlined in Section 02776, Article 1.05 <br />of the SPECIFICATIONS, the geomembrane is not damaged during installation, <br />and anchoring is performed in compliance with the SPECIFICATIONS and design <br />DRAWINGS. The CQA Monitor shall record the deployment on the deployment <br />log form. <br />Section 01400.2 Page 7 of 12 March 22, 2000 <br />Geosynthetic COA Plan Golder Associates Revision 5 <br />1AM209%final reporAspecs%0140026400