My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-10-30_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:34 PM
Creation date
10/31/2008 8:17:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/30/2008
Doc Name
TR Submittal- Phase IV b/c Perimeter Liner Extension
From
CC&V
To
DRMS
Type & Sequence
TR52
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of <br />construction. The DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA <br />Monitor, INSTALLER, CONTRACTOR, and others designated by the MANAGER shall <br />attend this meeting. The purpose of this meeting will be to: <br />? review the construction DRAWINGS, CQA Plan, and project <br />SPECIFICATIONS; <br />? define the responsibilities of each party; <br />? define lines of communication and authority; <br />? review method of documentation, testing procedures, and reporting <br />inspection data; <br />? establish testing protocols and procedures for correcting and documenting <br />construction deficiencies; and, <br />? discuss any changes that may be needed to ensure that construction will be <br />completed in compliance with the design. <br />? This meeting will be documented by the MANAGER or his designee and <br />copies distributed to all parties. <br />5.02 PROGRESS MEETINGS: <br />The MANAGER will hold a daily progress meeting, either before the start of work or at <br />the completion of work. At a minimum, this meeting will be attended by the CQA <br />Monitor, INSTALLER and CONTRACTOR. The purpose of this meeting will be to: <br />? review all the previous day's accomplishments and activities; <br />? review scheduled work location and activities for the day; and, <br />? discuss any problems or potential construction problems. <br />? This meeting will be documented by the CQA Monitor. <br />5.03 DEFICIENCY MEETINGS: <br />Special meetings will be held, as needed, to discuss potential problems or deficiencies. <br />At a minimum, these meetings will be attended by the CQA Monitor and INSTALLER or <br />CONTRACTOR. If the problem relates to a design issue, the MANAGER, DESIGN <br />ENGINEER and CERTIFYING ENGINEER should also be present. The meeting will be <br />documented by the CQA Monitor. <br />Section 01400.2 Page 5 of 12 March 22, 2000 <br />Geosynthetic CQA Plan Golder Associates Revision 5 <br />IAWK209%final reponlspecs%014002r5.doc
The URL can be used to link to this page
Your browser does not support the video tag.