My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-30_HYDROLOGY - C1996084
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996084
>
2008-10-30_HYDROLOGY - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:32 PM
Creation date
10/30/2008 2:49:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
HYDROLOGY
Doc Date
10/30/2008
Doc Name
3rd Quarter 2008 DMRS (COG-850044)
From
Peak Project Managment, LLC
To
DRMS
Permit Index Doc Type
DMR’s
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak Project Management, LLC <br />34115 County_ Road 20.8 Trinidad,. CO 81082 <br />Telephone: (719) 8464975 Fax: (719) 846-4930 Cell: (719) 859.0111 <br />ronthompson0wildbiue.net <br />Via Certified Mail - 70071490 0001 8185 1376 <br />October 24, 2008 <br />Colorado Department of Public Health and Environment <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Re: Discharge Monitoring Report - 3`d Quarter 2008 <br />Lorencito Canyon Mine - Permit No. COG-850044 <br />Discharge Monitoring Reports for the above reference permit are enclosed. Precipitation <br />during August resulted in all ponds receiving inflows during the month of August. Ponds <br />8A and 9B were observed discharging on August 10, 2008 and sampled in accordance <br />with permit requirements. The discharge resulted from 2.4" of rain on August 8" and <br />0.3" on August 9m. These events did not exceed the 10-year/24-hour storm event of 2.9". <br />On August 16th - 17'`, 3.1" of rain was received at Lorencito. This event did exceed the <br />10-year/24-hour storm event and resulted in additional discharges from ponds 8A and 9B. <br />They were sampled on August I e. Water approached discharge levels in ponds 5A, 6A, <br />7A and 9A, but they were not observed discharging. <br />.Additional rain was received on August ISO (0.2"). Ponds 5A and 6A were observed <br />discharging on August 2& and were sampled. Ponds 7A and 9A were not observed <br />discharging during the quarter. Pond l0A received minimal inflow during the quarter and <br />also did not discharge. <br />Maintenance was conducted on the pond 9B discharge riser in late September. The pond <br />was not dewatering and a blockage of the discharge structure was cleared. This activity <br />resulted in a discharge and this discharge was sampled on September 30`h. The discharge <br />was in compliance with all permit limitations.
The URL can be used to link to this page
Your browser does not support the video tag.