My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-27_INSPECTION - M1976027
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1976027
>
2008-10-27_INSPECTION - M1976027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:28 PM
Creation date
10/30/2008 10:32:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
INSPECTION
Doc Date
10/27/2008
Doc Name
Inspection report
From
DRMS
To
Skanska USA Civil West Rocky Mtn District
Inspection Date
8/28/2008
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.34 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.34 NA NA $7.24 $13.70 $8.05 $13.21 NA NA NA NA <br />-Attachment no. 2: NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.67 $12.45 $17.29 NA NA NA NA NA NA NA NA <br />Double shifts : $20.75 $6.22 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.46. $4.14 $5.76 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2:1 NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $6.01 $0.00 $2.02 <br />Attachment no. 2:1 NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br /> <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $27.67 $12.45 $17.29 $5.65 $13.70 $6.28 $13.21 $30.56 $6.01 $0.00 $2.02 <br />Double shifts : $20.75 $6.22 $8.64 [Attachment no. 2: <br />Triple shifts : $18.46 $4.14 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br /> <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.G.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br /> <br />Mechanic <br />$20.97 <br />$7.22 <br />$1.60 <br />$1.30 <br />$2.06 <br />$33.15 <br />Night : <br />$0.45 - <br /> <br /> <br />HOURLY EQUIPMENT COST SUMMARY Ownership Opera ting and Overhaul Operator Total <br /> Machine Attachments Cost/hr ($) <br /> Single shifts : $57.40 $77.43 $6.71 $32.78 $174.31 <br /> Double shifts : $35.62 $77.43 $6.71 $32.93 $152.68 <br /> Triple shifts : $28.36 $77.43 $6.71 $33.03 $145.52 <br /> <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(I Fuel <br />type Ripper <br />type <br />Dozer : Cat D8R Series 11 - 8U (20 310 NA 41.8. 22.8 8.7 11.5 diesel NA <br />Blade : Universal NA NA 6.0 NA 14.0 5.7 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2:1 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br />i otai weignt :1 os. 1 (US 1)
The URL can be used to link to this page
Your browser does not support the video tag.