Laserfiche WebLink
ROADABLE EQUIPMENT ;:; :::.:...................................................... .................................................................................................................... <br />....: ... . <br />sheet2.:of:2:. <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $44.99 1 $44.99 $44.99 <br />Subtotals :1 $44.99 1 $44.99 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Trinidad <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 55.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.18 0.18 Total non-roadable mob/demob cost $1,724.73 <br />Return time (hours) = 0.18 0.18 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost" : $16.36 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.86 0.36 <br /> <br /> <br />JOB TIME AND COST ::::......... <br />........................... <br />................................ X: X <br />............................................................................................... <br />Total job time <br />........ ...... <br />3.73.; hours <br /> Total job cost : $1.741