My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-28_INSPECTION - M1985165
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1985165
>
2008-10-28_INSPECTION - M1985165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:30 PM
Creation date
10/29/2008 9:38:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985165
IBM Index Class Name
INSPECTION
Doc Date
10/28/2008
Doc Name
Insp Rpt
From
DRMS
To
Harold A Winter
Inspection Date
10/6/2008
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT ;:; :::.:...................................................... .................................................................................................................... <br />....: ... . <br />sheet2.:of:2:. <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $44.99 1 $44.99 $44.99 <br />Subtotals :1 $44.99 1 $44.99 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Trinidad <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 55.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.18 0.18 Total non-roadable mob/demob cost $1,724.73 <br />Return time (hours) = 0.18 0.18 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost" : $16.36 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.86 0.36 <br /> <br /> <br />JOB TIME AND COST ::::......... <br />........................... <br />................................ X: X <br />............................................................................................... <br />Total job time <br />........ ...... <br />3.73.; hours <br /> Total job cost : $1.741
The URL can be used to link to this page
Your browser does not support the video tag.