My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-22_REVISION - M2001100
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001100
>
2008-10-22_REVISION - M2001100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:02:59 PM
Creation date
10/28/2008 12:24:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001100
IBM Index Class Name
REVISION
Doc Date
10/22/2008
Doc Name
Approval on the request to modify mining plan
From
BLM
To
United Companies
Type & Sequence
TR2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One other change in the interest of public safety and no trespassing is described below. <br />There is a good fence with a gate running along the east side of Phases 7 &.8. The gate <br />has been a constant problem, frequently opened by trespassers or cut and left open. <br />United is concerned someone will enter the property from this location on motorcycle, <br />four wheeler, etc. (vehicle of some sort - maybe horseback), and be injured on the <br />propert y. United has also had vandalism problems with front end loader cab glass being <br />broken out. United proposes to put a 8 to 10 ft. high safety berm of overburden along this <br />stretch of fence (on the pit side of the fence) to slowdown, if not stop, access to the pit.. <br />This material would also serve as the safety berm on Phases 7 & 8. <br />United Companies hasen't produced any material at the BLM location for quite some <br />time due to the demand for materials at other locations and due to the number of crushers <br />to satisfy the demand. By opening up a slightly larger mining area, more material can be <br />produced during by a single crusher move in, thereby providing more material for sale <br />and more royalty potential for the BLM. United has plans to begin stripping Phase 4 in <br />three or four weeks. United would appreciate your early consideration and approval of <br />out request. I've sketched the changes on the enclosed map of the area and am available <br />to answer any questions you may have. <br />Sincerely, <br />Brent Kerr <br />United Companies
The URL can be used to link to this page
Your browser does not support the video tag.