My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-25_REVISION - M1978091UG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978091
>
2008-09-25_REVISION - M1978091UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:01 PM
Creation date
10/28/2008 7:43:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
REVISION
Doc Date
9/25/2008
Doc Name
Response to adequacy review letter
From
Gault Group, Inc
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There may be springs in the pipe trench and Steve has suggested those flows will be <br />carried by the pipe bedding to the exit point of the pipes. These flows are anticipated to <br />be minimal and not undermine the pipe. <br />Additional air vents have been added as recommended and a pipe anchor has been <br />added at the upper pipe bend. Clay cutoff walls are shown on the profile to prevent <br />water undermining the pipe bedding. <br />Pie Exit: A riprap exit apron is shown on the drawings to dissipate energy from the <br />piped channel section. This will be an important item to prevent erosion at the exit and <br />should extend either side of the pipe a minimum of 3-pipe diameters. <br />Thank-you for the opportunity to assist with this project, I hope this review helps you in <br />moving forward with this mitigation. Please feel free to call me with any questions or <br />comments. <br />Sincerely, <br />udy Ki on, P.E.
The URL can be used to link to this page
Your browser does not support the video tag.