My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-27_REPORT - M2001054
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001054
>
2008-10-27_REPORT - M2001054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 12:32:52 PM
Creation date
10/28/2008 7:43:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001054
IBM Index Class Name
REPORT
Doc Date
10/27/2008
Doc Name
Annual Fee/Report/Map
From
Bridal Veil Construction
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT <br />Anniversary Date - October 28, 2008 <br />Permit M-2001-054 <br />DATE: 10-24-08 --- Submitted with map, report and Annual Report Form, and Check <br />number 2884 in the amount of $323. <br />FROM: Emery L. Olin <br />Bridal Veil Construction <br />1796 N. Main Street <br />PO Box 1412 <br />Ouray, CO 81427 <br />TO: Division of Minerals and Geology <br />AKA Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: Permit No M-2001-054 <br />Operation Name: Bridalveil <br />Anniversary Date: October 28, 2008 <br />Total Fee Due: $323 <br />Enclosed is our Annual Report for the year, anniversary date October 28, 2008, with a map <br />showing work complete to date, and check in the amount of $323. <br />We have produced and sold 1,126 yards of 1 inch Road base from October 1, 2007 to October 1, <br />2008. <br />We have been in the process of reclamation since 2005. We seeded all slopes in July, 2006. We <br />have received flash floods periodically, in which the Bridal Veil Creek flooded out portions of <br />our reclaimed banks. We have repaired damage and seeded the banks again. We are again in the <br />process of screening material which came down the channel and also which has come down to <br />the sediment pond. We have screened material to make the lower bench approximately 20 foot <br />larger. We have also started to build a berm on the north side of the property for noise control on <br />the lower bench because of complaints from a neighbor. <br />The City of Ouray is still working with the USFS to work out a plan to keep the run-off water <br />entering our channel. We would like to renew our permit until something is worked out on USFS <br />property so that water will not come from their property and over our reclaimed banks. <br />Thank you, <br />Emery L. Olin <br />Bridal Veil Construction LLC
The URL can be used to link to this page
Your browser does not support the video tag.