Laserfiche WebLink
FRDM :LAMBERT&ASSOCIATES <br /> <br />FAX NO. :9702493262 Jul. 14 2008 11:01AM P2 <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Tuesday, JuI18108 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: West Elk Mine Weather: C!'ear <br />Project Number: M06048MT 'temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: West Elk Mine Supervisor: Henry Barba <br />Specialty Contractor: West Elk Mine Specialty Superintendent or Foreman: Henry Barba <br />Source of Fill Material: Coal Mine Plans and Specs: NZA <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, sheepsfoot compactor and haul truck <br />Lambert and Associates Equipment Used - Manufacturer: CPN Sarial Number or Unit Number: 16 <br />Test Results were Verbally Given On-Site to: Proctor sample was obtained <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed; No <br />If yes, who was contacted? <br />Follow-up from Prior Visit; Proctor sample was obtained Retests Performed; <br />Concerns for Next Visit: Proctor sample was obtained Retests Needed: <br />Other personnel contacted on-site: nameMirm <br />Notes; <br />1 perfonned nuclear field density tests, as requested by Henry Barba with West Elk Mine, of material being placed for fill <br />on the refuse pile. Please refer to the test results sheets for approximate test locations and test results. The test <br />results indicate only the relative compaction and soil moisture content of the material tested at the elevation and <br />location tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes <br />