My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-09_ENFORCEMENT - C1981019
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981019
>
2008-10-09_ENFORCEMENT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:00 PM
Creation date
10/27/2008 2:49:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
ENFORCEMENT
Doc Date
10/9/2008
Doc Name
Settlement Agreement
From
DRMS
To
Colowyo Coal Company
Violation No.
CV2008003
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
History <br />A $0.00 penalty is appropriate for history. <br />Seriousness <br />I believe that a violation did occur and under the seriousness category the level of <br />low/moderate was appropriate. Although construction of this section of ditch was not <br />fully approved, at least 700 feet had been approved via technical revision 65 (TR-65) and <br />approval of the remaining 1300 feet was under review. Actual impacts as the result of <br />the unapproved construction were minimal. Therefore assessment of $750.00 is deemed <br />to be higher than appropriate and is being reduced to $500.00. <br />Fault <br />There is no disputing that the operator constructed the whole of the ditch prior to <br />obtaining final approval from the Division. In addition, the portion of ditch that was <br />approved in TR-65 was constructed in the wrong location and in conjunction with the <br />proposed but yet to be approved extension under review in technical revision 71 (TR-71). <br />Construction of the ditch prior to approval was avoidable and therefore, the fault <br />component shall stand as assessed at $500.00. <br />Number of Days of Penalty Assessed <br />I concur with 1 day. <br />Good Faith <br />The NOV has been fully abated as required, however, no extraordinary measures were <br />undertaken to expedite approval of TR-71 and insure proper installation of the ditch, <br />therefore, no credit for good faith will be granted. <br />Settlement Agreement Penalty <br />History $0.00 <br />Seriousness (moderate) $500.00 <br />Fault (unavoidable) $500.00 <br />Number of Days 1 <br />Good Faith $0.00 <br />Total Penalty $1,000.00
The URL can be used to link to this page
Your browser does not support the video tag.