Laserfiche WebLink
Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Pem-it Renewal 05 <br />Task description :Finish Grade Entire Site <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H Horsepower : 215 <br />Attachment no. 1 :NA Shift basis : 1 perday <br />Attachment no. 2 : Multi-shank ripper <br />Source of estimated acreage :Map 5 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet *" <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />` at 0 degrees, blade is perpendicular <br />to direction of travel. <br />"width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 5, 800 feet Altitude adjustment factor : 1.00 I (Cat HB) <br />Job efficiency adjustment factor : 0.85 r(lsh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />