My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-23_PERMIT FILE - C1983059A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059A
>
2008-05-23_PERMIT FILE - C1983059A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:56 PM
Creation date
10/27/2008 11:26:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
5/23/2008
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 018 State :Colorado Permifrob # : C-1983-059 <br />Date : 04/09/2008 County :Delta Abbreviation :none <br />User : JRS Site :Tenor Creek Loadout Filename : C059-018 <br />Permit or other job action :Permit Renewal 05 <br />Task description : Mobilize/Demobilize Equipment for Reclamation <br /> <br />,. ; : . <br />EQUIPMENT TRANSPORT RIG COST Shift basis : <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />_:. <br />>; <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $250.00 <br />-CAT 815E 22.97 $37.70 $88.67 1 $126.37 $88.67 $250.00 <br />-Cat621G 35.55 $50.48 $117.55 1 $168.03 $117.55 $250.00 <br />-CAT 14H 20.70 $39.50 $88.67 1 $128.17 $88.67 $250.00 <br />-Reveg Equipment 20.00 $78.00 $88.67 1 $166.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $777.05 $509.01 $1,000.00 <br />sheet 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.