Laserfiche WebLink
the existing powerline, bringing 12,470V power to the lORT Dewatering Installation Substation, where two <br />transformers will convert the incoming power to 2,400V and feed power to the l ORT Dewatering Wells 1 and 2. <br />The connecting pipeline tying to the Mine Water Return Line will be trenched and buried approximately 6 feet <br />deep. The connecting pipeline will run from the new lORT Dewatering Well No. 2 to the Mine Water Return Line, <br />and then parallel the Return Line for approximately 1,000 feet to the junction with the 6MN Water Transfer <br />Pipeline. Soil material will be removed and temporarily windrowed on one side of the trench, with trenched <br />material placed to the other side. Once the pipeline is placed, properly bedded, connected to the Mine Water <br />Return Line, and leak tested, trenched material will be backfilled and compacted, and soil material will be replaced <br />over the excavation and reseeded. It is anticipated that when the pipeline is no longer needed to support mining and <br />related operations, it will be plugged below grade and abandoned in-place. Reclamation of the well, when no <br />longer needed, will involve plugging and sealing the well consistent with approved sealing practices, consistent <br />with applicable State Engineer requirements. <br />(Note: Text for Coal Handling System components moved to pages 2.05-24 through 38) <br /> <br /> <br />MR08-228 2.05-56 03/06/08 <br />