My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-22_REVISION - C1981013
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981013
>
2008-10-22_REVISION - C1981013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:21 PM
Creation date
10/24/2008 1:19:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
REVISION
Doc Date
10/22/2008
Doc Name
Decision Letter & Form
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
MR83
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />October 22, 2008 <br />John McCulloch <br />New Elk Coal Company, LLC <br />122 West First Street <br />Trinidad, CO 80182 <br />Re: Golden Eagle Mine (Permit No. C-1981-013) <br />Decision - Minor Revision No. 83 (MR-83) <br />Update of Ownership and Control Information <br />Dear Mr. McCulloch: <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Decision Form for Minor <br />Revision No. 83 at the Golden Eagle Mine. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed decision form. If the amount of Bond Held <br />equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals <br />or exceeds the Revised Liability. This Minor Revision must not be implemented until any required <br />increase in bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincer ly, <br />9 ?4 <br />Kent A. Gorham <br />Environmental Protection Specialist <br />KAG/Ahd <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />Ron Thompson, Peak Project Management, LLC, with enclosures <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.