My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-03_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2008-06-03_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:27 PM
Creation date
10/24/2008 8:42:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
6/3/2008
Doc Name
Reclamation Cost Estimate
From
DRMS
To
File
Type & Sequence
MR347
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M4 , 34 7 Page 1 of 1 <br />File name: costsummary.xls <br />7j/L MS Gosf' csf <br />\ 0.F[IAMATION <br />Colorado Division of Reclamation, Mining and Safety <br />Tg • SAFLTT <br />Reclamation Cost Summary <br />Permit No. C-80-007 Prepared by: TK <br />V <br />;. ? Date: 6/3/2008 <br /> C,op <br />c y <br />Mine name: West Elk Permit or job action: TR-111 Cfs ? County: Gunnison <br />TASK LIST (DIRECT COSTS) " <br />a dµ -P <br /> r <br />47 ' <br />Task no. Task description Form Fleet Task Direct Cost <br /> Used Size Hours <br />11a Rip MDW pads ripper 1 4.46 $ 946 <br />11b Rip roads ripper 1 5.35 $ 1,135 <br />11c Regrade MDW pads dozer 1 25.07 $ 5,127 <br />11d Regrade roads dozer 1 30.09 $ 6,154 <br />11e Seal 14 MDWs approved in TR-111 borehole 1 94.70 $ 59,706 <br />11f Broadcast seed mix on MDW pads reveg 1 18.16 $ 17,420 <br />11g Broadcast seed mix on roads reveg 1 21.80 $ 22,112 <br />GRAND TOTAL - DIRECT COSTS 199.63 $ 112,600 <br />Indirect Costs <br />Contractor's overhead & profit <br />Liability insurance: 2.02% % of direct costs total = $ 2,275 <br />Performance bond: 1.05% % of direct costs total = $ 1,182 <br />Job superintendent: 99.82 hrs. at $ 39.38 per hour total = $ 3,931 <br />Profit: 10.00% % of direct costs total = $ 11,260 <br /> TOTAL O & P= $ 18,648 <br /> CONTRACT AMOUNT (direct + 0 & P)= $ 131,248 <br />DMG project management <br />Financial warranty processing (legal/related costs): NA <br />Engineering work and/or bid preparation: 4.25% % of contract $ 5,578 <br />Reclamation management and/or administration: 3.25% % of contract $ 4,266 <br />Contingency NA % of direct costs <br /> Total indirect reclamation costs $ 28,491 <br />Total performance bond amount (direct costs plus indirect costs) $ 141,091
The URL can be used to link to this page
Your browser does not support the video tag.