My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-23_INSPECTION - M2000154
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000154
>
2008-10-23_INSPECTION - M2000154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:23 PM
Creation date
10/23/2008 3:40:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000154
IBM Index Class Name
INSPECTION
Doc Date
10/23/2008
Doc Name
Inspection report
From
DRMS
To
Hankins Stone Company, Inc.
Inspection Date
8/27/2008
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 17-Oct-2008 <br />User : WHE <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no. <br />Abbreviation <br />Filename <br />M-2000-154 <br />none <br />M154-000 <br />Agency or organization name: DRMS <br />Permit or job action :Routine bond update <br />NA <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Highwall reduction from 1 H:1 V to 3H:1 V dozer 1 7.3 $1,242 <br /> <br />002 -Rough grade affected lands, dispurse stockpiled OVB dozer 1 33.3 $5,676 <br /> <br />003 -Redistribute topsoil 3 inch depth over 5 acres area dozer 1 5.2 $882 <br /> <br />004 -Revegetate 5 acres affected land revege 1 8.0 $4,257 <br /> <br />005 -Haul reclamation equipment to and from job site mobilize 3 4.0 $1,452 <br /> <br />006 -Remove misc debris, assume mass 10'L*5'W*5H @ $0.221cu.ft. NA 1 4.0 $55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 61.9 $13,564 <br />* includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />Site :Hankins Stone Quarry #1 <br />State : Colorado <br />County : San Miguel <br />TOTAL DIRECT COST * =I $13,564 <br />2.02 % of direct total = $274 <br />1.05 % of direct total = $142 <br />NA* NA NA total = NA <br />10.00 % of direct total = $1,356 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $1,773 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $15,337 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $767 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $3,040 <br />TOTAL BOND AMOUNT (direct + indirect) = $16,604
The URL can be used to link to this page
Your browser does not support the video tag.