Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 1011712008 <br />User: WHE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : San Miguel <br />Site : Hankins Stone Quarry#1 <br />Agency or organization name: DRMS <br />Permit or other job action :Routine bond update <br />Task description : Redistrubute topsoil 3 inch depth over 5 acres affected land <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :1-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $58.03 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $167.93 Total fleet cost/hour : $167.93 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2017 LCY factor : NA volume : 2,017 LCY <br />Source of estimate d volume : (5ac)(43560sf/ac)(0.25'D)/27 = 2016.67 cy <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2550 Ibs/LCY Net correction : 0.61 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 383.92 LCY/hr <br /> Adjusted fleet production : 383.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 5.25 Hours <br />Unit cost : $0.437 /LCY Total job cost : $882 <br />Permit/job# : M-2000-154 <br />Abbreviation :none <br />Filename :M154-003