Laserfiche WebLink
<br />TR-1 12 (related to TR-1 11) <br />• Is not a subject of this hearing, but is next to TR-111 area and has <br />issues similar to TR-111. <br />• Submitted simultaneously with TR-111. <br />• Is currently being reviewed by DRMS. <br />• Is a conceptual plan like TR-111. <br />• Proposes: <br />- 168 methane drainage wells, with roads/staging areas <br />- 80 acres total disturbance in 6 square miles <br />5