My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-23_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-10-23_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:23 PM
Creation date
10/23/2008 2:24:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
10/23/2008
Doc Name
Letter Application and Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR51
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />RECEIVED <br />October 20, 2008 OCT 2 3 2008 <br />Division ot? a ?fety n• <br />Mining <br />Marcia Talvitie <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie No. 1 Mine <br />Application for a Technical Revision <br />Stipulation No. 58 Reclamation Plan Details <br />Permit C-1981-038 <br />Dear Ms. Talvitie: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Stipulation No. 58 requires the Operator to provide an amended reclamation plan for <br />the cropland areas at the loadout facility by December 30, 2008. On behalf of Bowie <br />Resources LLC (BRL), enclosed is an application for a technical revision to incorporate <br />additional details regarding soil handling, soil amendments and seeding for the <br />reclamation work to be performed at the loadout facility. The following items explain the <br />proposed changes to the reclamation plan: <br />Volume I, pages 71 i and 82 were amended to indicate the reclamation plan <br />for the loadout is presented in Volume 7. <br />2. Ms. Robbie Baird-LeValley (874-2195) with the CSU extension service was <br />contacted regarding expected yield from the irrigated pasture. She indicated <br />that irrigated pasture should yield a first cutting of 1.5 tons per acre per year. <br />This 1.5 ton per acre yield will be utilized as the production standard for the <br />irrigated cropland. Pages 2.05-27 and 28 were amended to explain the <br />production standard and sampling methods. <br />3. David Dearstyne with the USDA and Jim Sharkoff, State Conservation <br />Agronomist, USDA, NRCS, provided some recommendations regarding soil <br />amendments to improve the soil for reclamation. Mr. Dearstyne's and Mr. <br />Sharkoff's a-mails are incorporated into the permit at Exhibit 14. Pages 2.05- <br />29 & 29i were amended to discuss soil amendments. <br />4. A brass impact sprinkler system will be utilized on the irrigated pasture. See <br />amended page 2.05-26.
The URL can be used to link to this page
Your browser does not support the video tag.