Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the <br /> inspection and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No <br /> company representative was present during the inspection. The Eastside Mine is in reclamation <br /> only status. Weather conditions on site were clear and warm. Ground conditions were dry. <br /> Roads The road leading into the Eastside Mine was dry and in good repair. The gate at the mine <br /> entrance was locked. Road ditches were in good repair. <br /> Hydrologic Balance The sediment pond was dry. No recent mine discharge was noted. The <br /> permanent diversion ditch showed no signs of erosion. The mine diversion ditch was generally <br /> in good repair. Some minor slumping of the diversion cut was noted on the upper portions of <br /> the ditch. A small amount of material (less than one cubic yard) was deposited in the ditch. It <br /> does not appear that the material in the ditch will reduce the capacity. The ditch cut should be <br /> visually monitored for future instability. The mine water pipe was not discharging. <br /> Backfilling & Grading The backfilled and graded area showed no signs of instability or erosion. <br /> The portal areas appeared stable. <br /> Revegetation • Vegetation was starting to emerge. The grasses could not be identified at this <br /> point in time. Some small shrubs were also noted. <br />