Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No company <br /> representative was present during the inspection. The Eastside Mine is in reclamation only status. <br /> The inspection involved viewing three aerial photographs taken by Harry Ranney of DMG on June 10, <br /> 1997. <br /> Hydrologic Balance The sediment pond was dry and embankments were well vegetated. The <br /> temporary drainage channel appeared to be in good repair. The permanent channel was well <br /> vegetated and did not show any signs of erosion. No major erosion features were noted on the <br /> reclaimed slopes. <br /> Backfilling & Grading The backfilled and graded area showed no signs of instability. The portal and <br /> fan area appeared stable. <br /> Revegetation Vegetation on the mine site looked relatively good for the second growing season. <br /> INumerous shrubs could be depicted around the poi id and lower portions of the undisturbed mine site. <br />