My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-20_INSPECTION - M2000014
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000014
>
2008-10-20_INSPECTION - M2000014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:17 PM
Creation date
10/21/2008 8:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000014
IBM Index Class Name
INSPECTION
Doc Date
10/20/2008
Doc Name
Inspection report
From
DRMS
To
Tri-River, Inc.
Inspection Date
10/1/2008
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action : Revised Bond Estimate for 9.9 Acres <br />Task description : Haul 2550 yds of topsoil <br /> <br /> <br />EO61PMEN N ;;:.9666: ( <br />HOURLY <br />T COST Basic machine: CAT 9 G (2002) <br /> <br />Horsepower : ...... <br /> <br />....... 235..... <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $29.49 NA <br />Operating cost/hour : $40.39 100 <br />Operator cost/hour: $32.78 NA <br />Total unit cost/hour : $102.66 Total fleet cost/hour : $102.66 <br />.......................................................... <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 2,550 LCY factor : NA volume : 2,550 LCY <br />Source of quantity take-off : Permit Application <br />Source of estimated swell factor : NA <br />........................................................... ............................... <br />HOURLY <br />ODUCT'l (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.575 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material up to 1/8" diameter 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : ,No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : -0.050 minutes <br />Adjusted basic cycle time : 0.525 minutes <br />Rolling Resistance - Road Conditions <br />Haul :Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained <br />Return :Firm, smooth, rolling, dir0t. surfaced, watered, maintained <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />N Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 0.00 3.00 3.00 0.4006 (Cat HB) <br />Return route : 500 0.00 3.00 3.00 0.3772 (Cat HB) <br /> Total travel time : 0.7778 minutes <br />Loader Bucket Capacity Total cycle time : 1.303 minutes <br />Rated capacity : 4.75 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.975 Loose material - mixed moist aggregates (95-100%) <br />Adjusted capacity : 4.63 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.92 (Cat HB) <br />Site altitude : 7,400 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.76 multiplier <br />Unadjusted hourly unit production : 213.29 LCY/Hr <br />Adjusted hourly unit production : 162.87 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 162.87 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 15.66 Hours <br />Unit cost : $0.630 /LCY Total job cost : $1,607 <br />
The URL can be used to link to this page
Your browser does not support the video tag.