My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-20_INSPECTION - M2000014
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000014
>
2008-10-20_INSPECTION - M2000014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:37:17 PM
Creation date
10/21/2008 8:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000014
IBM Index Class Name
INSPECTION
Doc Date
10/20/2008
Doc Name
Inspection report
From
DRMS
To
Tri-River, Inc.
Inspection Date
10/1/2008
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />...................................................:...:::.:....:....:.:..::::.:...................................................................... . <br />::::.:.......................................................... . <br />........................................................................................ <br />PR ............. <br />IDENTIFICATION <br />OJECT <br />Task #: 012 State : Colorado Permit/job #: M2000014 <br />Date : 1012012008 <br />User : PSH <br />County : Grand <br />Site : Yust Ranch Gravel Pit <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action : Revised Bond Estimate for 4 Acres <br />Task description : Haul 1200 yds of topsoil <br />.. <br />235 <br />HOURLY EQUIPMENT COST Basic machine : CAT 966G 2002 Horsepower <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $29.49 NA <br />Operating cost/hour : $40.39 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $102.66 Total fleet cost/hour : $102.66 <br />MATERIAL QUANTITIES ........................................................ ........................... .................................................................................... <br />Initial Swell Final <br />volume : 1,200 LCY factor : NA volume : 1,200 LCY <br />Source of quantity take-off : Permit Application <br />Source of estimated swell factor : NA <br />.;:.;:.; ............................. <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.575 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material up to 1/8" diameter 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled 10 ft. high or less 0.010 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : -0.050 minutes <br />Adjusted basic cycle time : 0.525 minutes <br />Rollins Resistance - Road Conditions <br />Haul : Firm, smooth, rolling, dirtAt. surfaced, watered, maintained <br />Return : Firm, smooth, rolling, dirblt. surfaced, watered, maintained <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />M) Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 0.00 3.00 3.00 0.4006 (Cat HB) <br />Return route : 500 0.00 3.00 3.00 0.3772 (Cat HB) <br /> Total travel time : 0.7778 minutes <br />Loader Bucket Capacity Total cycle time : 1.303 minutes <br />Rated capacity : 4.75 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.975 Loose material - mixed moist aggregates (95-100916) <br />Adjusted capacity: 4.63 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.92 (Cat HB) <br />Site altitude : 7,400 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.76 multiplier <br />Unadjusted hourly unit production : 213.29 LCY/Hr <br />Adjusted hourly unit production : 162.87 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 162.87 LCY/Hr <br />B TIME AND COST<;:•; :.............................. <br />......... ........ ............. <br /> <br />JO ......................... <br />.. ................... .... <br /> <br />............................................................ <br />............................................................. <br />.. <br /> <br />........... <br />.................... ...................... <br />Fleet size : 1 Loader(s) Total job time : 7.37 Hours <br />Unit cost : $0.630 /LCY Total job cost : $756 <br /> <br />Abbreviation :none <br />Filename : M014-012
The URL can be used to link to this page
Your browser does not support the video tag.