Laserfiche WebLink
BOREHOLE SEALING WORK <br />Task u: 13b <br />seine: West Elk <br />Pennit no.: C-80-007 <br />Permitting action: TR-113 <br />Date: 9/30/08 <br />User: TAK <br />Cwt of bulk cement Water <br />2,600 gal <br />Oeloplug Cut surface <br />(assuming 94lbs of <br />Hole Hole Cement cost Total rig Rig w/ crew truck w/ <br />water truck <br />d <br />t <br />i <br />(Circes, <br />easing S <br />Total cement per 1.18 of of Cement <br />volume per cwt <br />di <br />H <br />l Rig setup time Rig time to time hourly rate Total rig ver cos <br />r <br />w/driver S18.67 mark Total cost <br />am. <br />o <br />e <br />depth (ft) hole, that is 100 Ibs total cost <br />(CIRCES) <br />(of) per hole (hr) fill hole (setup + (Circes, Reed cos! (rig fill <br />hourly rate <br />Perin. <br />(Circes, <br />(m) <br />of cement fills 1.26 fill) drill, 9.0") time x <br />(Circes) diam.) $10.90/1() <br />of) truck rate) <br />Box Canyon north monitoring well JR-113) <br />6 400 79 62.8 $6.90 $433 1.33 0.79 2.12 $201.22 $426 $60 <br />Total hours 2.12 <br />Divided by number of rigs 1 <br />Net total hours 2.12 <br />$47 $117 $25 $1,049 <br />Grand total $1,049