Laserfiche WebLink
New Horizon Mine <br />TR-58 Adequacy Review <br />10-Oct-2008 <br />Page 5 of 5 <br />Appendix C - Maps <br />22) On Map R-2, a strip of ground along the southern side of the Staats parcel is <br />included in Phase 2 Area 8. The Phase 2 table on page 11 of the application <br />describes Area 8 as only "5th Avenue". Please update Map R-2 and/or the Phase <br />2 table to be consistent with one another. <br />23) Map R-1 gives the. post-mining contours for Phase 1 release, but the data does not <br />appear to represent the reconstructed BB Road east of 2700 Road. Please modify <br />the contours, as necessary, to reflect the current topography of all roadways <br />that have been reconstructed within the permit boundary. <br />Appendix D - Aerial Photos <br />24) This appendix contains four separate photographs of reclaimed lands within the <br />Phase 2 bond release areas, but none of them appear to have been taken from the <br />air, as the title would imply. <br />This concludes the Adequacy Review for New Horizon Mine SL-11. Please contact me <br />at (970) 247-1184 if you have questions or comments regarding the items listed above. <br />Sincerely, <br /> <br />Marcia L Talvitie, P.E. <br />Environmental Protection Specialist <br />xc: DRMS File