Laserfiche WebLink
New Horizon Mine <br />TR-58 Adequacy Review <br />10-Oct-2008 <br />Page 2 of 5 <br />Descriptions - Phase 1 <br />5) Areas 1 and 2 - Section 6 is in R 15 W, as opposed to R 158 W. Please correct <br />this typographical error. <br />6) Area 1 - The bearing given from the NE corner of Section to the point of <br />beginning does not appear to be correct. Please review this bearing, and revise <br />as necessary. <br />7) Area 2 - The distance given from the NE corner of Section 6 to the point of <br />beginning may not be correct. Please review, and revise if necessary. <br />Descriptions - Phase 2 <br />8) Area 1 - Please verify the distance from the NE corner of Section 6 to the point <br />of beginning, and revise if necessary. <br />9) Areas 1 thru 6 - Section 6 is in R 15 W, as opposed to R 158 W. Please correct <br />this typographical error. <br />10) Areas 7 and 8 - These areas are shown on Map R-2 and described in the table on <br />Page 11 of the application. Please provide a written description of the <br />dimensions of these areas (County Roads BB, 2700, and Sr" Avenue) if they are <br />to be included in SL-11. <br />11) Page 9 - Dates Reclamation Work Performed - Map R-1 actually shows the years <br />that each Phase 1 area achieved bond release (which may or may not be the year <br />that each area was reclaimed). Please verify, and modify the text if necessary. <br />Contrary to the application, Map R-2 does not show the years that each Phase 2 <br />area was reclaimed; the statement is in error. Please delete the statement, or <br />revise Map R-2 accordingly. <br />12) Page 9 - Description of Bond Release Amount: See preceding comment <br />regarding Map R-2. <br />13) Phase 2 Mine Areas (Page 10) - Areas 7 (2700 Road and BB Road) is included in <br />this table, and is also shown on Map R-2. The application does not elsewhere <br />refer to Area 7. The table on page 10 comments, for area 7, "Road in final <br />contour and condition according to permit." Please elaborate on to what <br />`permit" this comment refers. Section 2.05.3(3)-8 of the PAP includes SU-99- <br />0834, the special use permit with Montrose County, approved on 21-Oct-1999. It <br />makes reference to various specifications to be used in construction of the county <br />roads, but contains no design details (roadway plan, profile, width, layer <br />thicknesses, right-of-way width, etc.). Please provide the Division with the