Laserfiche WebLink
EXHIBITS- PERMANENT MAN-MADE STRUCTURES (6 4 19) <br />Underground gas well service pipelines and gas wells, as shown on <br />Exhibits C and F, are located within 200 feet of the proposed amended <br />mining limits. A copy of an agreement with the owner of these structures is <br />attached. <br />All other existing significant, man-made structures within the proposed <br />amended permit boundary and within 200 feet of the permit boundary are <br />owned by and on property owned by the applicant/ operator. The <br />structures within the proposed amended permit boundary and the <br />"covered arena" in the eastern section of Phase 3 have been or will be <br />removed from the property prior to mining.