Laserfiche WebLink
EXHIBIT L - RECLAMATION COSTS (6.4.12) <br />As with the original and revised permit applications, it is assumed that <br />reclamation will be performed at the cessation of mining. The following assumes <br />the total additional area to be reclaimed to be 15.6 acres. The costs described in <br />the following chart are based on the most recent CIRCES estimation provided for <br />the latest revision (AM-04) and current cost data. <br />Description Unit Unit Cost Cost <br />Backfillin (01 3) Hr $ 147 $ 5,880 <br />Topsoil/ Grading 54 Hr 150 8,100 <br />Pond Slope Topsoil Grading 40 Hr 150 6,000 <br />Reve etation 11 Ac 879 9,669 <br />Mobilization 1,000 <br /> <br />Total $ 30,649 <br />(Costs shown above include labor, fuel and overhead costs)