Laserfiche WebLink
Table D-3 <br />MINING TONNAGE PER AREA <br />Phase Acres Acres Tons Gravel Gravel Life Exposed <br /> (Total) (Mined) (years) Area <br /> Acres/Year <br />1 20.95 19.50 512,798 1.9 9.8 <br />2 115.44 111.32 2,341,935 8.7 12.8 <br />3. Mining Timetable <br />Mining operations would begin in 2008, provided that all permits are granted. Mining <br />would last approximately 11 years, although the market plays a large role in the length of <br />the mining. Western Gravel LLC expects the average production from the pit is 250,000 <br />tons per year. <br />4. Facilities and Equipment <br />The site may contain: <br />- A portable screening/washing plant with a 500 gallon diesel tank <br />- A portable Asphalt plant with a 25.00 gallon diesel tank <br />- A portable Concrete plant with a 500 gallon diesel tank <br />- Portable Scales <br />- A portable office trailer <br />- A portable crusher with a 2,000 gallon diesel tank <br />- A fuel farm with a 10,000 gallon diesel tank <br />- A portable QC lab trailer <br />- A small portable shop trailer <br />Mobile equipment which will be used on site over the mine life: <br />- 1 or 2 Front end loaders <br />- 1 or 2 Bulldozers <br />- 1 Motor Grader <br />- 1 Scrapper <br />- Track hoe <br />- 1 Water truck <br />- 1 Fueling Truck <br />- Several off-road haul trucks <br />- Various 24 ton and 14 ton road haul trucks as necessary to move the permitted <br />product to market <br />9