Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2008 <br />Inspection Date: 03/24/08 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non-discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. Excellent Moderate ew Poor <br />2). Erosion forming Gullies: Extensive Some Dew None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No l? <br />4). Erosion of the downstream toe of the embankment? Yes No y- <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? - Yes No ,?- <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: <br />OTHER OBSERVATIONS: <br />MSHA Qualified Impoundment Inspector <br />3 /;z(/ <br />Date