Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #4 <br />Inspection Period: First Quarter 2008 <br />Inspection Date: 03/24/08 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies west of the Development Waste Pile. The majority of <br />run-off from this waste pile flows to this pond. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. C,& cellent Moderate Few Poor <br />2). Erosion forming Gullies: Extensive -Some None <br />3). Is wave action causing erosion: . <br />On the Upstream embankment?" Yes No L <br />At the principal spillway inlet? Yes No c? <br />4). Erosion of the downstream toe of the embankment? Yes No t/ <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes <br />- Yes <br />Yes y. <br />Yes <br />Just starting <br />No <br />No <br />No <br />No <br />None