My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-10_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2008-10-10_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2020 2:15:47 PM
Creation date
10/16/2008 3:44:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/10/2008
Doc Name
Proposed Decision & Findings of Compliance for PR14
From
Proposes 152 Methane Drainge Wells in Panels E-2 to E-12 next 12 years
Permit Index Doc Type
Findings
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 73 <br />ACTIVITIES APPROVED UNDER MINOR REVISION MR-324, NAMELY CONSTRUCTION OF A <br />0.5-ACRE DRILL PAD AND DRILLING OF TWO BOREHOLES TO FACILITATE <br />MONITORING/SAMPLING, INJECTING WATER, FOAM, AND NITROGEN INTO THE MINE, MUST <br />NOT BEGIN UNTIL MOUNTAIN COAL COMPANY RECEIVES U.S. FOREST SERVICE APPROVAL <br />FOR THESE ACTIVITIES. THIS STIPULATION RECOGNIZES THE URGENT AND UNIQUE NEED BY <br />MOUNTAIN COAL COMPANY TO DRILL THESE BOREHOLES IMMEDIATELY UPON RECEIPT OF <br />USFS APPROVAL. <br />STATUS: COMPLIED WITH 11/10105 BY SUBMITTAL OF MR-324. <br />Stipulation No. 74 <br />LONGWALL MINING AT THE WEST ELK MINE IN E-SEAM PANELS 1 THROUGH 12 MUST <br />NOT BEGIN UNTIL THE MEASURES REQUIRED BY STIPULATION 75 HAVE BEEN <br />SUBMITTED TO THE DIVISION AS A TECHNICAL REVISION AND BEEN APPROVED. <br />STATUS: COMPLIED WITH 9/2/08 BY APPROVAL OF TR-108 AND SUBMITTAL OF A LETTER <br />FROM THE OSE, DATED SEPTEMBER 2, 2008. <br />Stipulation No. 75 <br />LONGWALL MINING AT THE WEST ELK MINE IN E-SEAM PANELS I THROUGH 12 MUST <br />NOT BEGIN UNTIL MEASURES APPROVED BY THE DIVISION OF WATER RESOURCES, <br />OFFICE OF THE STATE ENGINEER, COLORADO DEPARTMENT OF NATURAL RESOURCES <br />TO STRENGTHEN MONUMENT DAM AND ITS SOUTHERN-ADJOINING LANDSLIDE HAVE <br />BEEN INSTALLED, AND UNTIL AN ENGINEERING CERTIFICATION, DOCUMENTING THAT <br />THE MEASURES WERE INSTALLED IN ACCORDANCE WITH THEIR DWR/OSE-APPROVED <br />DESIGNS, ALONG WITH A COPY OF A FINAL STATEMENT OF ACCEPTANCE FROM THE <br />DWR/OSE, HAS BEEN SUBMITTED TO THE DIVISION OF MINERALS AND GEOLOGY. <br />STATUS: COMPLIED WITH 9/2/08 BY SUBMITTAL OF A LETTER FROM THE OSE, DATED <br />SEPTEMBER 2, 2008. <br />Stipulation No. 77 <br />THE PRIOR LIABLITY AMOUNT OF $13,546,180 AND REVISED LIABILITY AMOUNT OF <br />$13,570,455 SHOWN ON THE DECISION FORM FOR MR-337 ARE SUBJECT TO FINAL <br />APPROVAL OF PERMIT RENEWAL NO. 5. <br />STATUS: COMPLIED WITH 3/30/07 BY DECISION TO APPROVE RN-05 BECOMING FINAL. <br />2008. <br />Stipulation No. 78 <br />73
The URL can be used to link to this page
Your browser does not support the video tag.