Topsoil will be removed ahead of surface disturbance activities. Any vegetative cover <br />that would interfere with topsoil removal will be removed first. The West Elk Mine had <br />already completed the majority of topsoil and vegetation removal when the mine <br />facilities were constructed in 1981. Since the majority of reclamation will occur upon <br />completion of mining, topsoil stockpiles have been designed and maintained so as to <br />minimize wind and water erosion and to preserve the seedbed material. Stockpiles in <br />place for five years or more have been or will be seeded with the permanent seed mix. <br />Subsoil not fully suitable for seedbed material is also excavated, as necessary, for <br />construction purposes. Topsoil consisting of all of the A horizon and part of the B <br />horizon of each soil series present is stripped before construction begins. <br />The operator will distribute 12 to 18 inches of topsoil over the entire disturbed area. <br />However, the Lower Refuse Disposal Area will be replaced with 18 to 24 inches of <br />topsoil and subsoil. A variance to the four feet of nontoxic cover has been granted to the <br />West Elk Mine. This variance is discussed further in Section VIII, Coal Mine Waste <br />Banks in this Findings Document. After the soil has been replaced, the surface is <br />loosened and roughened by disking, harrowing, or dragging, which will increase <br />infiltration, thereby reducing surface runoff. Various conditioners and neutralizers may <br />be used to modify seedbed conditions, or enhance vegetative cover. <br />V. Sealing of Drilled Holes and Underground Openings <br />The Division will require that each hole, well or other underground opening be <br />capped, sealed, backfilled, or otherwise properly managed (4.07.3). <br />VI. Use of Explosives <br />Mining techniques used at the West Elk Mine do not require blasting as part of the <br />regular extraction cycle. Occasionally, explosives are used for underground <br />construction purposes. These uses only require small quantities of explosives. <br />MCC's Explosives Handling and Blasting Procedures are presented in Exhibit 41 of <br />the permit document. Map 53 shows the location of the powder magazine. <br />Limited application of explosives may be necessary for additional future surface <br />construction. Pursuant to Rule 4.08.1(2), blasts that use more than five pounds of <br />explosives or a blasting agent will be conducted according to the blasting schedule <br />required by 4.08.3. As appropriate, a pre-blasting survey will be performed <br />(4.08.2). <br />VII. Disposal of Excess Spoil <br />1. The West Elk Mine will not require a disposal area for excess spoil (4.09). <br />VIII. Coal Mine Waste Banks <br />40